Renovation since 1987, Utrecht Get a fixed quote

Strip it.Build it.

A Brandt plasterer smoothing a fresh wallStrip-out

Full renovations by one crew that stays from the strip-out to the last coat of paint. One fixed quote, one finish date.

Get a fixed quote

1,240rooms rebuilt since 1987

Week 0.
Week 6.

A kitchen in Lombok, Utrecht. Walls stripped to the studs, new wiring, new floor, new kitchen. Swing the hammer.

The kitchen during the strip-out, bare walls and loose wiring The finished kitchen with white cabinets and an oak floor BeforeAfter
Kitchen, Lombok4.20 x 3.10 m6 weeksOn the agreed date

What we build

Measured twice.
Quoted once.

Week 0

Site visit

We measure every wall and every pipe, free of charge.

Week 1

Fixed quote

One price, one finish date. No surprises later.

Week 2

Strip-out

Down to the studs, dust walls up, neighbours told.

Week 3 to 5

Build

Same crew every day. Photos of the progress every Friday.

Week 6

Handover

We walk the room with you and fix every last detail.

A dark bathroom with a freestanding bath and a city view
Bathroom, Wittevrouwen 4 weeks
New oak stairs with a white wall
Stairs, Oog in Al 2 weeks
A marble shower with a brass rain head
Shower, Tuindorp 3 weeks
A white kitchen with wooden worktops
Kitchen, Zuilen 6 weeks
A Brandt crew member finishing a wall
"They said six weeks. On day forty-one we cooked dinner in the new kitchen."

Sanne and Joris, Lombok

Fourteen people, all on our own payroll. The crew that strips your room is the crew that finishes it.

Got a room
that needs work?

Thanks. We call you within one working day.